Next: Remarks
Up: Time Scale Version, Vector
Previous: Examples of PSE
Denote by
the call rate prediction for the part
of the period
using the data up to the period
and the expert model with fixed parameters
that determine the impact scales
and the delay and duration
of all the special events, including DSE and PSE.
We minimize the sum
 |
|
|
(147) |
Here
is the end and
is the beginning of the "learning" set.
Defining the expression (2.87) as a function 'fi' in the file 'fi.C'
we may directly apply various global and local optimization methods
in the same way as they are used estimating the ARMA parameters (see section 1).
mockus
2008-06-21